Bulk Water Supply Schemes

Problem

The 8 inch pipe line laid in 2017 is insufficient to draw available water through the 3 new 60 HP pumps. The 12 inch previous water line draws 120,000 Gallon water in 1 hour whereas 8 inch line draws 120,000 gallon water in 2 hours. Water from main line coming from Hub Dam is available 18 to 24 hours every 10 days. Since 8 inch line takes more time to draw water, a lot of available water is wasted.

Solution

Realignment of Pumping Station Header Laying of another 18 inches (Same as header dia) pipe straight outside the pumping station. Reducing pipe to 12 inches dia, making a 45 degree turn with Elbow and extending pipe for 20 ft.. Replacing 8 inch Pipe with 12 Inch pipe for 1300 feet Laying of another 12 inches dia pipe for another 1300 ft. Connecting the new 12 inches dia pipe to existing 8 inches dia pipe after 1300 ft.

Benefits

0

Households

0

Tanker Cost

0

Savings

0

Community Savings

" The Water Foundation is registered under the Trust Act and has the approval from FBR under section 2(36) classifying it as a not for profit organization"

Copyright © 2022 The Water Foundation - All Rights Reserved.

Copyright © 2022 The Water Foundation - All Rights Reserved.